CLIENT: ISAGEN
DESCRIPTION: Shielding and civil works in the intake of the HPP.

CLIENT: EMEC-URRASA ESP
DESCRIPTION: Design, manufacture and transport of hydromechanical equipment (2 sets of racks for the intake).

CLIENT: MINEROS S.A.
DESCRIPTION: Design, manufacture and assembly of hydromechanical equipment (racks and gates).

CLIENT: IMPSA
DESCRIPTION: Manufacture of bottom discharge gates.

CLIENT: EPM
DESCRIPTION: AOM of the HPPs: Sonsón I (8MW), Sonsón 2 (10MW), Caracolí (2MW), La Rebusca (0,4MW), Río Piedras (0,3MW), Río Abajo (0,750MW), Támesis (1MW) and El Limón (0,66MW).

CLIENT: EGETSA
DESCRIPTION: AOM of the HPP Prado.

CLIENT: ELECTROLIMA
DESCRIPTION: AOM of the HPPs: Rio Recio, Pastales, Mirolindo and Ventana.

CLIENT: AES
DESCRIPTION: Design, supply and install a new shield (Lining) for the replacement of Pandeo II in the lower conduction tunnel.

CLIENT: ENEL
DESCRIPTION: Disassembly, change of seals and assembly of (5) ball valves DN 1400 of the main units and one (1) ball valve DN 450 of the smaller units during the shut down of the Guavio HPP. (Client: ENEL).

CLIENT: ENEL
DESCRIPTION: Runner repairment.

Client: EMGESA
Description: Service of reconditioning of the Generation Units and their associated and strategic equipment in the energy production of the HPP Guavio, HPP Guavio Menor and HPP Dario Valencia.

CLIENT: VOITH
DESCRIPTION: Installation of all electromechanical equipment in the power house of 2 Pelton turbines of 45 MW each.

DESCRIPTION: Electromechanical wind tower assembly (1MW).